Living room remodel in progress — fresh framing and new recessed lighting rough-ins visible in an open-concept space
A-01
SCALE 1:50
Licensed & Permitted · Greater Metro Area

Your living room,
rebuilt from
the blueprint up.

We knock walls, run new electrical, float custom built-ins, and finish with trim tight enough to run your finger along without catching a seam. Permits pulled before a single hammer swings.

Scroll
Structural HeadersLoad-Bearing Wall RemovalPermit-First ProcessNew Electrical CircuitsCustom Built-InsRecessed LightingOpen-Concept LayoutsFinish CarpentryFireplace SurroundsLVP & Hardwood FloorsCoffered CeilingsDrywall & Skim CoatStructural HeadersLoad-Bearing Wall RemovalPermit-First ProcessNew Electrical CircuitsCustom Built-InsRecessed LightingOpen-Concept LayoutsFinish CarpentryFireplace SurroundsLVP & Hardwood FloorsCoffered CeilingsDrywall & Skim Coat
Section 01
Problem → Solution

Every old living room has the same three problems.

We've rebuilt enough of them to know exactly where the pain is — and exactly how to fix it, on paper, before demo day.

P-01
Load-Bearing Guesswork
Load-Bearing Guesswork problem — outdated living room showing the issue
STRUCTURAL HEADER REQ'D
The Problem

That wall you want gone? Half the contractors you called said "probably fine." The other half said "call an engineer." Nobody gave you an answer.

Load-Bearing Guesswork solution — finished living room after Blueprint remodel

100% permitted

structural work

The Solution

We hire the structural engineer on Day 1. The beam specs are on the permit drawings before anyone touches a framing nail.

P-02
Outdated Electrical
Outdated Electrical problem — outdated living room showing the issue
NEW 20A CIRCUIT — PANEL SCHEDULE ATTACHED
The Problem

Your 1994 living room runs on a single 15-amp circuit. You can't run the TV, the lamps, and the space heater without tripping a breaker.

Outdated Electrical solution — finished living room after Blueprint remodel

NEC 2023

code compliant

The Solution

New dedicated circuits, recessed can rough-ins, and a clean panel schedule — all to current NEC code, all inspected.

P-03
Dead Layout, Wasted Space
Dead Layout, Wasted Space problem — outdated living room showing the issue
FURNITURE PLAN OVERLAY — VERIFY CLEARANCES
The Problem

The room is 18×14 and it still feels cramped. Furniture floats in the middle because the walls are in all the wrong places.

Dead Layout, Wasted Space solution — finished living room after Blueprint remodel

18×14 ft

space fully utilized

The Solution

We draw the furniture plan before demo. Built-ins are dimensioned to the inch. The room is designed to live in before a single stud is touched.

Section 02
Process

From blank walls to move-in ready
in 9 weeks.

No surprise delays

Gantt timeline shared before contract signing. You see every phase before we start.

WK 1
WK 2
WK 3
WK 4
WK 5
WK 6
WK 7
WK 8
WK 9
01

Site Assessment & Drawings

Week 1–2
02

Permits Pulled

Week 2–3
03

Demo & Rough-In

Week 3–5
04

Drywall & Built-Ins

Week 5–7
05

Finish Work & Punch List

Week 7–9
01

Week 1–2

Site Assessment & Drawings

We measure every wall, locate every stud, and mark every load-bearing element. Structural engineer on-site. Full construction drawings produced.

02

Week 2–3

Permits Pulled

Building, electrical, and structural permits filed simultaneously. We don't start demo until every permit is in hand — no exceptions.

03

Week 3–5

Demo & Rough-In

Selective demolition, beam installation, electrical rough-in, low-voltage layout. First inspection passed before walls close.

04

Week 5–7

Drywall & Built-Ins

Hang, tape, skim coat. Custom built-in carcasses installed plumb and level. Second inspection scheduled.

05

Week 7–9

Finish Work & Punch List

Trim, paint, hardware, light fixtures. Every seam tight, every corner square. Final inspection, final walkthrough, keys back to you.

Why we pull permits before swinging a hammer

Unpermitted structural work can void your homeowner's insurance, trigger a stop-work order mid-project, and tank your home's resale value. Every Blueprint job is on record with your municipality. When you sell, buyers see clean permits — not question marks.

✓ Always Permitted
Section 03
Proof

Numbers from actual jobs.

143

Projects Completed

Since 2018

$0

Surprise Change Orders

On fixed-scope jobs

100%

Permit Rate

Every single job

9 wks

Avg. Project Duration

Full gut & rebuild

Before: cramped living room with dated carpet and closed-off layout
Before
After: open-concept living space with hardwood floors and recessed lighting
After

Glen Ellyn Open Concept

$38,400

Wall removal, beam, flooring, lighting

Before: living room with blank walls and outdated fireplace surround
Before
After: custom built-in shelving flanking updated fireplace surround
After

Naperville Built-Ins

$24,700

Custom built-ins, fireplace, new circuits

"We bought a 1987 ranch specifically because we knew the front room needed to go. Blueprint took out two walls, ran a beam, and opened it into the kitchen. The permit process took 11 days. Demo started on Day 12. We were in for Thanksgiving."

MO

Marcus & Diane Okafor

Homeowners, Glen Ellyn, IL

Project

Open-concept conversion, load-bearing wall removal

Investment

$38,400

8 weeks

"Every contractor I called said 'we'll figure out the beam size when we're in the walls.' Blueprint showed up with engineer drawings on the first meeting. That's when I knew."

PV

Priya Venkataraman

Homeowner, Naperville, IL

Project

Fireplace surround, built-in shelving, new electrical

Investment

$24,700

6 weeks

"The line-item estimate they sent before we signed had 47 line items. No allowances. No 'TBD.' Every fixture, every board foot of trim, every hour of electrical labor. That level of detail is how you know nobody's going to come back asking for more money."

TB

Tom & Sheila Brannigan

Homeowners, Wheaton, IL

Project

Full living room gut and rebuild, coffered ceiling

Investment

$52,100

9 weeks

Section 04

Find Out What Your
Remodel Actually Costs.

Five questions. Two minutes. A real ballpark — not a "call for a quote" runaround.

1
2
3
4
5
Step 01 of 05

How big is the space?

Select the range that best describes your living room.

Not ready to estimate yet?

Download our free Remodel Planning Checklist — 47 questions to ask any contractor before signing.